Nanjiang to Niuyukou Oil Pipeline Management Applications

Simulator Scope

nanjiang-image2The simulator scope of supply includes for the entire 225 km of pipeline including two intermediate pumping stations. This complex simulator includes all equipment, the control scheme, the tanks, and the surge suppression equipment. In real time, the simulator provides a complete picture of the flow, pressure, temperature to assist the operator in controlling stable pipeline operation.

nanjiang-image3The Nanjiang to Niuyukou pipeline management system provides optimisation and safety of operation functionality. The system makes use of the advanced VariSim optimiser processes in parallel with its powerful surge analysis capability and efficiency monitoring modules.

A comprehensive training course and training environment is provided as part of the supply. A classroom style environment located in XuZhou provides SCADA system training for up to 15 trainees simultaneously.

nanjiang-image4

System Nanjiang to Niuyukou
Location China
Scope Pipeline Management
Client Sinopec
Installation Date 2009
Length 225+km
Fluid Variable Crude Oils

nanjiang-image1